Tip: Activate javascript to be able to use all functions of our website

Massawa water supply (emergency measure)

Description

Emergency measure (A) aimed to improve the drinking water supply of the city of Massawa in the most urgently needed areas (increasing the storage capacity of the existing Dogali well field, repairing the raw water extraction system, repairing water reservoirs and the disinfection plant). In the first phase of the main measure that was planned to follow (B), the aim was to carry out more far-reaching measures such as the development of a new well field, the construction of new transport lines, the expansion of the distribution network and the construction of seepage pits. In addition to the structural measures, the training measure (C) aimed to transform the publicly owned municipal water supply department into an autonomous municipal utility (Water and Sanitation Company/WASCO).

Overall rating: 3

Is based on:

Evaluation criteria & rating scale

­

Notes on the methods

Download PDF

More on the topic

Massawa water supply (emergency measure)

To the evaluation

Kafr El Sheikh Wastewater Disposal

To the evaluation

Water Supply and Sewage Disposal in Pristina (Phase II)

To the evaluation

Overview 2019/20

To the overview

Impact evaluations

To the impact evaluations