Tip: Activate javascript to be able to use all functions of our website

Rural Infrastructure Programme – Phase III

Description

The RIP III programme specified above includes the development and rehabilitation of rural roads as well as markets in the provinces of Kampong Cham and Kampong Chhnang. Six road sections with a total length of 39 km and two markets in Kampong Cham province were constructed. The programme follows on from two previous phases (RIP I and RIP II) and was expanded to include a further phase.

Overall rating: 3

Is based on:

Evaluation criteria & rating scale

­

Notes on the methods

Download PDF

More on the topic

Vidin-Calafat Danube Bridge

To the evaluation

Flood damage repair on rural infrastructure (FRRI)

To the evaluation

Inner-city Bypass Lomé

To the evaluation

Overview 2019/20

To the overview

Impact evaluations

To the impact evaluations