Flood damage repair on rural infrastructure (FRRI)

Description

The FRRI project included the repair of flood damage on rural roads, bridges, inflow and outflow ducts as well as at rural schools. The reason for the project was the high damage to rural infrastructure caused by the exceptionally high flooding of the rainy season in 2011. The FRRI was implemented in the provinces of Kampong Cham, Kampong Chhnang, Siem Reap, Kampong Thom, Kratie and Prey Veng. A total of 117 km of rural roads and seven schools were repaired. The project ran parallel to the long-standing activities of German FC as part of the Rural Infrastructure Programme (RIP), which has been rehabilitating rural roads and social infrastructure in various phases and regions from 2007 to date.

Overall rating: 2

Is based on:

Relevance: 2
Effectiveness: 2
Efficiency: 2
Impact: 2
Sustainability: 3

Evaluation criteria & rating scale

­

Country:Cambodia
Sector:Transport & Storage
Budget funds

Federal budget funds that are passed on to partners by KfW Entwicklungsbank in the form of grants and interest rate reductions for loans. These do not have to be repaid.

:
8.000.000 €
Total funds

Funds that KfW raises on the capital market and then passes on to partners as a loan. The loan must be repaid.

:
8.000.000 €
Year of project completion:
2014