Renewable energy investment programme

Description

At the time of the project appraisal, the project involved the construction of four small hydropower plants in the southern Brazilian state of Santa Catarina with a total capacity of 53 MW. Ultimately, two small hydropower plants (run-of-river power plants) were built with a total capacity of 34 MW, consisting of a dam, intake conduit/tunnel, lock, power house, transformer station/switchboard plant and a high-voltage line to transport the energy produced.