Renewable energy investment programme

    Description

    At the time of the project appraisal, the project involved the construction of four small hydropower plants in the southern Brazilian state of Santa Catarina with a total capacity of 53 MW. Ultimately, two small hydropower plants (run-of-river power plants) were built with a total capacity of 34 MW, consisting of a dam, intake conduit/tunnel, lock, power house, transformer station/switchboard plant and a high-voltage line to transport the energy produced.

    Overall rating: 3

    Is based on:

    Relevance: 3
    Effectiveness: 3
    Efficiency: 3
    Impact: 2
    Sustainability: 2

    Evaluation criteria & rating scale

    ­

    Country:Brasil
    Sector:Energy
    Budget funds: 47.714.069,74 €
    Total funds:47.714.069,74 €
    Year of project completion:
    2017

    Notes on the methods

    Download PDF

    More on the topic

    Rural electrification

    Promotion of solar power in El Salvador

    Cooperative Programme to Promote Renewables and Energy Efficiency

    Overview 2019/20

    Impact evaluations