    Description

    At the time of the project appraisal, the project involved the construction of four small hydropower plants in the southern Brazilian state of Santa Catarina with a total capacity of 53 MW. Ultimately, two small hydropower plants (run-of-river power plants) were built with a total capacity of 34 MW, consisting of a dam, intake conduit/tunnel, lock, power house, transformer station/switchboard plant and a high-voltage line to transport the energy produced.

    Overall rating: 3

    Is based on:

    Relevance: 3
    Effectiveness: 3
    Efficiency: 3
    Impact: 2
    Sustainability: 2

    Evaluation criteria & rating scale

    ­

    Country:Brazil
    Sector:Energy
    Budget funds: 5.000.000 €
    Total funds:15.000.000 €
    Year of project completion:
    2017